A Tale of Two Bridges: The San Francisco–Oakland Bay Bridges of 1936 and 2013

★★★★★ 4.5 92 reviews

US$11.28
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by caped.co
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$11.28
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Jul 2
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by caped.co
Free 30-day returns Details

Product details

Management number 231908429 Release Date 2026/06/18 List Price US$11.28 Model Number 231908429
Category

A Tale of Two Bridges is a history of two versions of the San Francisco—Oakland Bay Bridge: the original bridge built in 1936 and a replacement for the eastern half of the bridge finished in 2013. The 1936 bridge revolutionized transportation in the Bay Area and profoundly influenced settlement patterns in the region. It was also a remarkable feat of engineering. In the 1950s the American Society of Civil Engineers adopted a list of the “Seven Engineering Wonders” of the United States. The 1936 structure was the only bridge on the list, besting even the more famous Golden Gate Bridge. One of its greatest achievements was that it was built on time (in less than three years) and came in under budget. Mikesell explores in fascinating detail how the bridge was designed by a collection of the best-known engineers in the country as well as the heroic story of its construction by largely unskilled laborers from California, joined by highly skilled steel workers. By contrast, the East Span replacement, which was planned between 1989 and 1998, and built between 1998 and 2013, fell victim to cost overruns in the billions of dollars, was a decade behind schedule, and suffered from structural problems that has made it a perpetual maintenance nightmare.This is narrative history in its purest form. Mikesell excels at explaining highly technical engineering issues in language that can be understood and appreciated by general readers. Here is the story of two very important bridges, which provides a fair but uncompromising analysis of why one bridge succeeded and the other did not. Read more

ISBN10 1943859264
ISBN13 978-1943859269
Edition 1st
Language English
Publisher University of Nevada Press
Dimensions 6 x 1 x 9 inches
Item Weight 15.3 ounces
Print length 216 pages
Publication date April 3, 2017

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.5 out of 5
★★★★★
92 ratings | 38 reviews
How item rating is calculated
View all reviews
5 stars
83% (76)
4 stars
4% (4)
3 stars
2% (2)
2 stars
1% (1)
1 star
10% (9)
Sort by

There are currently no written reviews for this product.